Deicing Operations at a Centralized Deicing Pad
|
|
GRV stationed at Centralized Deicing Pad
|
|
|
|
|
|
Examples of dedicated project equipment
|
|
2.2M gallon storage for DTW spent ADF
|
|
|
|
|
|
Frac Tanks placed adjacent to centralized deicing pad (with pump trailer)
|
|
Frac Tanks adjacent to New Deicing Pad (end of Concourse C)
|
|
|
|
|
EQ installed, remote controlled/automated pumping system (access by escort only across active taxiway) Above is local control at pump
|
|
Remote operator at receiving end of pipeline (under taxiway)
|
|
|
|
Trailer housing 600 gpm pumping equipment
|
|