Echo Pad (approx. 9.1 acres)
- E-North Tank 400,000 gallons
- E-South Tank 200,000 gallons
- E-East Tank 200,000 gallons
- E-West Tank 200,000 gallons
Charlie Pad (approx. 10.3 acres)
- C-West Tank 200,000 gallons
- C-East Tank 200,000 gallons
Sierra Pad (approx. 16.9 acres)
- S-East Tank 1,200,000 gallons
- S-West Tank 200,000 gallons
Yankee North Pad (approx. 1 acre)
- Y-North Tank 140,000 gallons
Yankee South Pad (approx. 0.6 acres)
- Y-South Tank 200,000 gallons
FedEx Pad (approx. 4 acres)
- FedEx Tank 100,000 gallons
FBO Pad (approx.1.5 acres)
EQ Operations at PIT
- Two (2) site vehicles
- Two to Three (2-3) Elgin-Vactor Glycol Recovery Vehicles
- One (1) dedicated Tractor with 6,500 gallon tanker
- Three (3) trash pumps, each capable of pumping 250 gal/min
- All necessary hoses and fittings
- One (1) 21,000 gallon frac tank
- 2.2M gallons of on-site storage (bolted and Modu-tanks)
- 600k surge storage available off-site
- 44,000 gallon per day Reverse Osmosis low concentrate treatment system
Since the start of the PIT project, EQ has managed:
- Over 13,500,000 gallons of spent ADF/stormwater transported to EQ Glycol Processing Unit for recycling
- Recycled over 1,600,000 gallons (13,800,000 pounds) of industrial grade Propylene Glycol (PGI)
- Over 13,000,000 gallons processed through Reverse Osmosis system. Permeate discharged to local POTW. (Permit held by EQ Airport Services)
- Over 10,000,000 additional gallons of dilute (ppm) material disposed of at off-site facilities.
Comprehensive Environmental Management Services for the Aviation Industry
Solutions:
|